pipeline backfill soil stone crusher

Get Price And Support

Backfill materials around pipline in slope with high

Sep 14, 2011 · Alternatively, instead of #57, consider a well graded crushed rock such as 3/4 inch road base which will have a much lower permeability than #57. Typically, granular bedding only needs to go to the springline, backfill above the springline will have little effect on the pipe

Get price

Polyethylene Pipe Embedment Materials HDPE Trench

The embedment material may be imported, such as a crushed stone, or it may be the ("native") material excavated from the trench to make room for the pipe. The embedment material should provide adequate strength, stiffness, uniformity of contact (i.e., completely envelop the pipe) and stability to minimize deformation of the pipe due to earth

Get price
[]

STANDARD SPECIFICATION PART 1 GENERAL

TRENCHING, BACKFILLING, AND COMPACTING STD SPEC 02223 4 2.02 IMPORTED MATERIAL FOR BACKFILL--TRENCH ZONE Imported material shall conform to that specified for native earth backfill or imported sand. 2.03 IMPORTED SAND--PIPE BASE AND PIPE ZONE A. Imported sand used in the pipe base and pipe zone shall consist of natural or manufactured

Get price

backfill crushed concrete do not use

aashto specifications for crushed stone as backfill materials. Section 209 Granular Backfill Wisconsin Department of . AASHTO 57 This material has a 1-1 2 inch top size and is a clean material Often used for backfill for retaining walls used for subase for sheds also sometimes used as driveway stone Also used as the primary raw aggregate in Ready Mixed Concrete and some Hot-Mixed Asphalt

Get price

6 TYPES OF BACKFILL MATERIALS USED IN CONSTRUCTION

Mar 04, 2016 · The only soil type in this category that might be considered suitable as backfill is inorganic clay (CH). Use of CH soils should be avoided in confined areas if a high degree of compaction is needed to minimize backfill settlement or to provide a high compression modulus.

Get price

BUILDING A DRY BASEMENT

To keep the drain pipe from filling with sediment, it must be set in a layer of clean coarse gravel or crushed stone that is fully wrapped in a layer of heavy-duty filter fabric on all sides. After rolling out the filter fabric starting at the top of the footing, spread 3 to 6 in. of stone as a base for the pipe.

Get price
[]

31 20 00 EXCAVATION, TRENCHING AND BACKFILLING

A. Backfill Soil material used to fill an excavation. 1. Initial Backfill Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe. 2. Final Backfill Backfill placed over initial backfill to fill a trench. B. Base Course Aggregate layer placed between the

Get price
[]

02210 TRENCHING, BACKFILLING AND COMPACTION OF

A. Backfill Soil materials used to fill an excavated trench 1) Initial Backfill (Select Earth Backfill) Backfill placed beside and 12 inches over the top of the pipe in a trench, including haunches to support sides of pipe. 2) Final Backfill (Common Earth Backfill) Backfill placed over the initial backfill to fill a trench.

Get price

Gravel Sand Site Fill Stone R.J. Valente Companies NY

#2 stone 3/4" 1½" #3 stone 1½" 2½" crusher run-subbase; stone dust; stone fill/riprap light stone fill 4" 9" medium stone fill 2 3 feet in diameter ; heavy stone fill ; ballast stone; Run of Bank Material. General fill all purpose sand /clay mix; Clean sand for general backfill, pipe and cable bedding; Gravel

Get price

Installation Guidelines Baughman Tile Co.

Note Class III materials are gravel/sand/silt/clay mixtures with limited fines. (Refer also to the CPPA technical booklet Structural Design Method for Corrugated Polyethylene Pipe.) Minimum covers presented here were calculated based on at least 6″ (0.15m) of structural backfill material over the pipe crown with an additional layer of compacted native soil for a total cover as shown.

Get price
[]

SECTION 19 TRENCH EXCAVATION, BEDDING AND

the Contractor's control, the stronger pipe or improved bedding and backfill shall be provided at the Contractor's expense. 19-1.02.C Water Pipe Water pipe minimum and maximum trench widths shall be as shown on Standard Drawing 8-17 unless otherwise shown or specified in the Contract. If trench widths at the top of the pipe

Get price

'Self-Compacting' Soils Underground Construction

In effect, this doubles the allowable backfill height over the pipe (ACPA 2013). Installation . The installation design for buried pipe is often based on achieving a high level of soil support. That support depends on the embedment soil being properly com pacted. Misconceptions about soil compaction may prevent attaining the necessary pipe support.

Get price

Best backfill materials to keep new perimeter drain clean

May 23, 2012 · A lower-risk option seems like gravel around the pipe, with sand top of the gravel then soil backfill (essentially removing the fabric), but I'm not sure. Two other small side questions (1) if we use gravel, the stone yard said around here all the builders backfill using

Get price
[]

SECTION 15 BACKFILLING mawss

placing of pipe. Select material shall be granular soil freefrom rock, grass, wood or other deleterious material. If in the opinion of the Owner or the Owner's representative, the material from the excavation is not considered to be satisfactory for backfill, the overcut shall be backfilled with crushed slag, crushed stone

Get price